The left three lanes of northbound Interstate 5 in Everett will close north of State Route 526, from 77th to 61st Streets Southeast, from 8 p.m. Tuesday, Aug. 13, to 6 a.m. Wednesday, Aug. 14 for paving.
Washington State Department of Transportation maintenance crews will use the lane reduction to repair damaged sections of pavement.
People should expect delays and remember to move over if possible and slow down when driving through a work zone.
Real-time traffic information is available on the WSDOT mobile app and the real-time travel map.
Real first and last names — as well as city of residence — are required for all commenters.
This is so we can verify your identity before approving your comment.
By commenting here you agree to abide by our Code of Conduct. Please read our code at the bottom of this page before commenting.